Volume 38, 2002, Issue 38
Highlights from this issue include:
Peter Darby and G.G. Pique advance position in ERI
5 MGD brackish RO plant at Pinellas received 6 firms consortium
TWDB signed SOI revision for seawater desalination prototype project
MEDRC completed hybrid plant designs research for international desalination project
Shortest timeframe for desalination plant claimed by Doosan
Seawater prototype cost-sharing signed between Burec, Long Beach