YearBook
Back to listing
Selected References: bMain Contractor
- Tuas Water Reclamation Plant Contract 3D2 – Domestic Liquids Module 2 – MEICA, Singapore, Tuas 2022, 85.9 MGD MBR
- Tuas Water Reclamation Plant Contract 3D1 – Domestic Liquids Module 1 – MEICA and NEWater, Singapore, Tuas 2021, 85.9 MGD MBR
- Tuas Water Reclamation Plant Contract 3D1 – Domestic Liquids Module 1 – MEICA and NEWater, Singapore, Tuas 2021, 26.1 MGD RO
Selected References: EPC Contractor
- Jurong Water Reclamation Plant, Singapore 2015, 59,000 m³/d MBR
- Chesnut Avenue Water Work, Singapore 2015, 60.0 MIDG UF
- Changji Water Reclamation Plant, Singapore 2012, 60 MIDG MBR
Selected References: EPC and O&M Contractor
- Second Changi NEWater Plant, Singapore 2014, 50.0 MIDG RO