YearBook
Back to listing
Selected References: Remineralization (CO2 - Acidified)
- El Tor, Egypt 2017, 30,000 m³/d RO
- Qurayyat IWP , Oman 2016, 200,000 m³/d RO
- Rabab Harweel Integrated Project (RHIP), Harweel, Oman 2016, 927 m³/d RO
- Yanbu, Saudi Arabia 2015, 30,000 m³/d RO
- Charles Meyer SWRO Plant , Santa Barbra, Califonia, United States 2015, 10,475 m³/d RO
- Ma’aden Wa’ad Al-Shamal, Wa’ad Al-Shamal, Saudi Arabia 2015, Other / Unknown
- Masdar Renewable Energy, Abu Dhabi, United Arab Emirates 2015, RO
- Masdar renewable energy, Abu Dhabi, United Arab Emirates 2015, RO
- Minera Escondida, Antofagasto, Chile 2014, 216,000 m³/d RO
- Central Java Power, Pemalang, Central Java, Indonesia 2014, Other / Unknown
- Sadara Chemical , Jubail, Saudi Arabia 2013, 178,560 m³/d RO
- Ma'aden, Al Khafji, Saudi Arabia 2013, Other / Unknown
- Ghalilah, United Arab Emirates 2012, 68,140 m³/d RO
- Paraguaná, Venezuela 2012, RO
Selected References: CO2 Dosing Supplier
- Balikpapan Refinery Plant, Balikpapan, East Kalimantan, Indonesia 0, 1,800 m³/d Other / Unknown