Selected References: EPC Contractor
- Grupo Mexico Residual Water Treatment and Reuse Plant with Remote Pretreatment Station, MBR Plant and Reverse Osmosis 0, 6,912 m³/d RO
- Ternium Processing Water Treatment Plant 0, 4,320 m³/d RO
Selected References: Design, Equipment, Construction, Installation and Start-Up
- Penoles Wastewater Treatment Plant with Biological Process, Tertiary Filtration and Uv Light Disinfection for Reverse Osmosis Feeding 0, 4,492 m³/d RO
Selected References: General Contractor for Detailed Engineering, Civil and Electromechanical Works and Start-Up
- Ford Advanced Treatment Plant of Industrial and Sanitary Wastewater with Membrane Biological Reactor Process 0, 1,296 m³/d MBR
Selected References: Design, Equipment, Construction, Installation, Start-Up and Operation and Maintenance
- Accuride Wastewater Treatment Plant with Membrane Biological Reactor (MBR) and Reverse Osmosis for Water Reuse in Industrial Processes 0, 326 m³/d RO