Volume 46, 2010, Issue 34
Tunnel construction of Victoria desalination plant starts
Construction has begun on the 1.5km (0.94 mi) long concentrate outfall tunnel and 1.2km (0.75 mi) long intake tunnel for the 411 ML/d (108 MGD)...
Construction has begun on the 1.5km (0.94 mi) long concentrate outfall tunnel and 1.2km (0.75 mi) long intake tunnel for the 411 ML/d (108 MGD)...