Volume 46, 2010, Issue 34

Tunnel construction of Victoria desalination plant starts

Construction has begun on the 1.5km (0.94 mi) long concentrate outfall tunnel and 1.2km (0.75 mi) long intake tunnel for the 411 ML/d (108 MGD)...