Volume 57, 2021, Issue 6
SWRO pilot intake is operational
When Poseidon commissioned the 50 MGD (189,250 m3/d) Carlsbad SWRO in December 2015, it was permitted as a co-located facility, sharing a seawater...
When Poseidon commissioned the 50 MGD (189,250 m3/d) Carlsbad SWRO in December 2015, it was permitted as a co-located facility, sharing a seawater...