Volume 43, 2007, Issue 9
Shoaiba awaits EPC
There is still no news on the EPC contractor selection for the 150,000 m3/d (39.6 MGD) of additional capacity required for the Shoaiba IWPP. The...
There is still no news on the EPC contractor selection for the 150,000 m3/d (39.6 MGD) of additional capacity required for the Shoaiba IWPP. The...