Volume 45, 2009, Issue 17
Recognition for both GWR system and Polyopamine coated membranes
The CDM-designed 70 MGD (265,000 m3/d) Orange County Groundwater Replenishment (GWR) System has won the 2009 American Council of Engineering...
The CDM-designed 70 MGD (265,000 m3/d) Orange County Groundwater Replenishment (GWR) System has won the 2009 American Council of Engineering...