Volume 8, 1972, Issue 20
PVTE work scope change
Potential PVTE pilot plant operators be advised that scope of work has changed to include assembly of the 11,500 GPD unit at Wrightsville Beach. An...
Potential PVTE pilot plant operators be advised that scope of work has changed to include assembly of the 11,500 GPD unit at Wrightsville Beach. An...