Volume 6, 1970, Issue 21
OSW revises VTE prototype/module scope
In the revised scope of work on the VTE prototype/module, contractors are still being asked to determine optimum 200 MGD distillation plant under...
In the revised scope of work on the VTE prototype/module, contractors are still being asked to determine optimum 200 MGD distillation plant under...