Volume 52, 2016, Issue 30
Jeddah 4 SWRO project to put on hold
Tendering for the Saline Water Conversion Corporation’s 400,000 m3/d (105.7 MGD) Jeddah 4 SWRO project is said to be on hold following reports that...
Tendering for the Saline Water Conversion Corporation’s 400,000 m3/d (105.7 MGD) Jeddah 4 SWRO project is said to be on hold following reports that...