Volume 51, 2015, Issue 19
In brief: Draft EIR for Monterey Peninsula Water Supply Project released
The Draft EIR for the proposed 9.6 MGD (36,336 m3/d)SWRO plant, which will be part of CalAm Water’s Monterey Peninsula Water Supply Project...
The Draft EIR for the proposed 9.6 MGD (36,336 m3/d)SWRO plant, which will be part of CalAm Water’s Monterey Peninsula Water Supply Project...