Volume 27, 1991, Issue 11
Hydropro-Butler low bids Indian River RO plant
Apparent low bid of $1,358,610 came from Butler Construction teamed with Hydropro for 1 MGD reverse osmosis plant for North Beach Station of Indian...
Apparent low bid of $1,358,610 came from Butler Construction teamed with Hydropro for 1 MGD reverse osmosis plant for North Beach Station of Indian...