Volume 2, 1966, Issue 13
Estimate dual plant and unit water costs
The four train MSF water plant's design proceeded from these principal ground rules: 200 MW of salable power credited at 5.3 mills/kw-hr. (Israel...
The four train MSF water plant's design proceeded from these principal ground rules: 200 MW of salable power credited at 5.3 mills/kw-hr. (Israel...