Volume 50, 2014, Issue 10
Consultants shortlisted for Cape Verde SWRO plants
Three consultants were shortlisted to undertake the design, tender assistance and construction supervision of two 20,000 m3/d (5.3 MGD) SWRO plants...
Three consultants were shortlisted to undertake the design, tender assistance and construction supervision of two 20,000 m3/d (5.3 MGD) SWRO plants...