Volume 30, 1994, Issue 30
CH2M Hill possible winner in Alamitos Barrier specs design
Though no engineering selection has been made for Alamitos Barrier 4.5 MGD reclaimed water project, and probably won't before mid-August, it seems...
Though no engineering selection has been made for Alamitos Barrier 4.5 MGD reclaimed water project, and probably won't before mid-August, it seems...