Volume 49, 2013, Issue 12
Beach wells not a pretreat panacea
Although the 24,000 m3/d (6.3 MGD) Aruba SWRO-2 continues to operate at approximately 100 percent of capacity, the W.E.B. Aruba operators continue...
Although the 24,000 m3/d (6.3 MGD) Aruba SWRO-2 continues to operate at approximately 100 percent of capacity, the W.E.B. Aruba operators continue...