Volume 2, 1966, Issue 45

B-L-H again submits lowest construction bid at St. Thomas

A single module 2.5 MGD desalting plant offer from Baldwin-Lima-Hamilton, as it turned out, is the evaluated low bid following the Nov. 1 public...