Volume 8, 1972, Issue 33
Aruba Consultant
In 1969 Tebhin was low on largest plant bid it had prepared up to that time, $1,443,000 for a 1.6 MGD plant for the Water and Power Dept. (W.E.B.)...
In 1969 Tebhin was low on largest plant bid it had prepared up to that time, $1,443,000 for a 1.6 MGD plant for the Water and Power Dept. (W.E.B.)...