Volume 62, 2026, Issue 23
Alkimos pipeline completed
More than one-half of the 33.5km (21 mi) underground trunk main that will connect Perth’s future 137,000 m3/d (36 MGD) Alkimos Seawater...
More than one-half of the 33.5km (21 mi) underground trunk main that will connect Perth’s future 137,000 m3/d (36 MGD) Alkimos Seawater...