Volume 54, 2018, Issue 9

ACWA Power and Tecton Engineering bids lowest price in Umm Al Quwain IWP project

Although fourteen bidders had been pre-qualified to bid the 204,400 m3/d (54 MGD) Umm al Quwain (UAE) IWP, only three bids were opened late last...