Volume 60, 2024, Issue 9
20-yr old SWRO to be upgraded/expanded
When it was commissioned by an IDE-Veolia-Elran conso-rtium in 2005, the 330,000 m3/d (87.2 MGD) Ashkelon project in Isael was one of the largest...
When it was commissioned by an IDE-Veolia-Elran conso-rtium in 2005, the 330,000 m3/d (87.2 MGD) Ashkelon project in Isael was one of the largest...