Volume 2, 1966, Issue 14
OSW open bids on advanced San Diego II plant $1,885,000 is low
Chicago Bridge & Iron submitted the low construction proposal of $1,885,000 out of a total of six bids received, all from the U.S. desalting...
Chicago Bridge & Iron submitted the low construction proposal of $1,885,000 out of a total of six bids received, all from the U.S. desalting...